COCA-COLA FACTORY IN NATAKHTARI
About Project

ALL-P GROUP successfully cooperated with the world brand of soft drinks Coca-Cola and carried out large-scale works in the new factory.

 

ALL-P GROUP carried out the concrete arrangement works in the internal area up to 19,000 m2 and the external area up to 15,000 m2. According to international requirements, in the dry zones of the inner part of the factory territory, an industrial floor with a powder-hardened surface, and in the production area and laboratory rooms - a polymer and polymer-concrete floors corresponding to the HACCP standard were arranged.

 

What does the polymer flooring provide? It is featured with many advantages in the industry: prevention of the spread of harmful bacteria, chemical resistance to organic and inorganic acids, resistance to physical loads, easy for maintenance.