At first, ALL-P GROUP's activity consisted of floor screeding work. The company has 16 years of experience in this area. In 2007, ALL-P GROUOP introduced the first pumping equipment for boiling in Georgia, after which the floor screeding work became mechanized in the country.
Service advantage:
Perfectly flat surface as required by the German industrial standard N DIN18202
• High mortar grade B-20 and B-22.5 in accordance with British Standards.
• Proposal/arrangement of noise and vibration reduction systems (materials).
Areas of use:
· Residential buildings;
· Hotels;
· Offices;
· Shopping malls;
· Industrial estates, etc.