Nikora
About Project

"Based on the results obtained, I am happy to recommend ALL-P GROUP," said Gennady Buda, Chief Engineer of Nikora. 

ALL-P GROUP worked on the newly built facility of the food manufacturing company Nikora.

Within the framework of the project, a concrete coating was arranged  on the exterior of the building, and a polymer floor was installed in the production area. Floor screeding works were also carried out. 

The scope of the work performed amounted to 14,480 sq.m.

Construction services