ALL-P GROUP Company arranged concrete industrial floors, drainage systems, and sewage wells on the external territory of the company Global Real Estate Ltd.
First stage ALL-P GROUP performed foundation works, which consisted of cutting the ground, its reinforcement, and the subsequent arrangement of a 20-centimeter cover of B30-grade concrete.
Due to the vastness of the space, it was necessary to make dilation cuts, which were filled with sanomeric. This solution reduces stress on the concrete and prevents corrosion.
The scope of work carried out by ALL-P GROUP covered 1,250 square meters.