ALL-P GROUP arranged a polymer-coated parking area for a multifunctional commercial building.
The principal challenge was non-sanded cement coating, though without cementing it, by processing the existing surface and the right technical solutions, ALL-P GROUP arranged polymer coating, which meets all the international standards of the parking area.
The main task was to apply a cement coating unpolished, yet without casting cement, through treatment of the existing surface and the right technical solutions, ALL-P GROUP organized a polymer coating that meets all international standards of the parking area.
All-P GROUP arranged the following on the same site:
The project was commissioned by GAMA Ltd.
The scale of parking works amounted to 6500 sq. m.