ALL-P GROUP performed works in the industrial facility of the distribution company Eurotrade operating under European standards.
Within the framework of cooperation, the company was rendered with the main services of ALL-P GROUP.
Repair and floor technology works were performed. In the outdoor area, concrete was poured, and in the warehouse area, a concrete floor with a powder-hardened surface was arranged.
The work process took place on 2458.1 sq.m. area.