Grim Constructionแƒ‘แƒ”แƒขแƒแƒœแƒ˜แƒก แƒ˜แƒแƒขแƒแƒ™แƒ”แƒ‘แƒ˜
About Project
Used Services

ALL-P GROUP completes large-scale projects using innovative technology with the ๐—Ÿ๐—ฎ๐˜€๐—ฒ๐—ฟ ๐—ฆ๐—ฐ๐—ฟ๐—ฒ๐—ฒ๐—ฑ ๐— ๐—ฎ๐—ฐ๐—ต๐—ถ๐—ป๐—ฒ.

Advantages of the ๐—Ÿ๐—ฎ๐˜€๐—ฒ๐—ฟ ๐—ฆ๐—ฐ๐—ฟ๐—ฒ๐—ฒ๐—ฑ ๐— ๐—ฎ๐—ฐ๐—ต๐—ถ๐—ป๐—ฒ:


โœ”๏ธ Compliance with the German construction standard DIN18202;


โœ”๏ธ Absolute precision;


โœ”๏ธ Time efficiency (the ability to cover up to 3,000 sq.m. in a single pour).

 

As a result, the industrial concrete floors completed by ALL-P GROUP stand out for their long service life and perfectly even surface.

Currently, by order of LLC Grim Construction, industrial concrete floors are being installed at the facility located in the village of Gamarjveba using the laser leveling system.

The mentioned project includes 14,000 sq.m. of warehouse space.